{"id":837355,"date":"2026-09-22T18:21:02","date_gmt":"2026-09-22T18:21:02","guid":{"rendered":"https:\/\/www.abnewswire.com\/pressreleases\/?p=837355"},"modified":"2026-09-22T18:21:02","modified_gmt":"2026-09-22T18:21:02","slug":"ez-steel-becomes-the-only-international-pipe-fitting-supplier-for-the-manila-metro-project","status":"publish","type":"post","link":"https:\/\/www.abnewswire.com\/pressreleases\/ez-steel-becomes-the-only-international-pipe-fitting-supplier-for-the-manila-metro-project_837355.html","title":{"rendered":"EZ Steel Becomes the Only International Pipe Fitting Supplier for the Manila Metro Project"},"content":{"rendered":"<p style=\"text-align: justify;\">Changsha,Hunan, China &#8211; September 22, 2026<\/p>\n<p style=\"text-align: justify;\">As a professional pipe fitting supplier, we are proud to support the Manila Metro Project with high-quality products such as ASTM A234 WPB Pipe Fittings, A105N flanges, and GI pipe fittings, ensuring stable and safe pipeline systems.<\/p>\n<p style=\"text-align: justify;\">Here are our materials list\uff1a<\/p>\n<table>\n<thead>\n<tr>\n<th>SN<\/th>\n<th>PRODUCTS<\/th>\n<th>STANDARD AND GRADE<\/th>\n<th>DIMENSIONS<\/th>\n<th>THEORETIC WEIGHT (KG\/PC)<\/th>\n<th>QUANTITY (PCS)<\/th>\n<th>KGS<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1<\/td>\n<td>Galvanized Iron Flange<\/td>\n<td>ASTM A105<\/td>\n<td>ASTM A105 \/ G.I Flange SORF CL150 \/ 50mm&Oslash;<\/td>\n<td>2.30<\/td>\n<td>13,000<\/td>\n<td>29,900<\/td>\n<\/tr>\n<tr>\n<td>2<\/td>\n<td>Black Iron Welded Elbow 90 Deg.<\/td>\n<td>ASTM A234WPB<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Elbow 90 deg. X 200mm&Oslash; Sch 40<\/td>\n<td>20.38<\/td>\n<td>60<\/td>\n<td>1,223<\/td>\n<\/tr>\n<tr>\n<td>3<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Elbow 90 deg. X 150mm&Oslash; Sch 40<\/td>\n<td>10.17<\/td>\n<td>350<\/td>\n<td>3,560<\/td>\n<\/tr>\n<tr>\n<td>4<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Elbow 90 deg. X 100mm&Oslash; Sch 40<\/td>\n<td>3.84<\/td>\n<td>300<\/td>\n<td>1,152<\/td>\n<\/tr>\n<tr>\n<td>5<\/td>\n<td>Black Iron Welded Elbow 45 Deg.<\/td>\n<td>ASTM A234WPB<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Elbow 45 deg. X 150mm&Oslash; Sch 40<\/td>\n<td>5.09<\/td>\n<td>50<\/td>\n<td>255<\/td>\n<\/tr>\n<tr>\n<td>6<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Elbow 45 deg. X 100mm&Oslash; Sch 40<\/td>\n<td>1.95<\/td>\n<td>50<\/td>\n<td>98<\/td>\n<\/tr>\n<tr>\n<td>7<\/td>\n<td>Black Iron Welded Equal Tee<\/td>\n<td>ASTM A234WPB<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Equal Tee 150mm&Oslash; Sch 40<\/td>\n<td>8.81<\/td>\n<td>60<\/td>\n<td>529<\/td>\n<\/tr>\n<tr>\n<td>8<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Equal Tee 100mm&Oslash; Sch 40<\/td>\n<td>3.77<\/td>\n<td>30<\/td>\n<td>113<\/td>\n<\/tr>\n<tr>\n<td>9<\/td>\n<td>Black Iron Welded Tee Reducer<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Reducer 200mm&Oslash; x 150mm&Oslash; Sch 40<\/td>\n<td>15.76<\/td>\n<td>60<\/td>\n<td>946<\/td>\n<\/tr>\n<tr>\n<td>10<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Reducer 200mm&Oslash; x 100mm&Oslash; Sch 40<\/td>\n<td>15.38<\/td>\n<td>20<\/td>\n<td>308<\/td>\n<\/tr>\n<tr>\n<td>11<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I Reducer 150mm&Oslash; x 50mm&Oslash; Sch 40<\/td>\n<td>8.22<\/td>\n<td>20<\/td>\n<td>164<\/td>\n<\/tr>\n<tr>\n<td>12<\/td>\n<td>Black Iron Welded Flange<\/td>\n<td>ASTM A105<\/td>\n<td>EZ Steel \/ ASTM A105 \/ B.I Flange SORF ANSI150 \/ 200mm&Oslash;<\/td>\n<td>13.70<\/td>\n<td>100<\/td>\n<td>1,370<\/td>\n<\/tr>\n<tr>\n<td>13<\/td>\n<td>EZ Steel \/ ASTM A105 \/ B.I Flange SORF ANSI150 \/ 150mm&Oslash;<\/td>\n<td>8.60<\/td>\n<td>320<\/td>\n<td>2,752<\/td>\n<\/tr>\n<tr>\n<td>14<\/td>\n<td>EZ Steel \/ ASTM A105 \/ B.I Flange SORF ANSI150 \/ 100mm&Oslash;<\/td>\n<td>5.90<\/td>\n<td>120<\/td>\n<td>708<\/td>\n<\/tr>\n<tr>\n<td>15<\/td>\n<td>Black Iron Welded Blind Flange<\/td>\n<td>EZ Steel \/ ASTM A105 \/ B.I Blind Flange SORF ANSI150 \/ 200mm&Oslash;<\/td>\n<td>20.50<\/td>\n<td>50<\/td>\n<td>1,025<\/td>\n<\/tr>\n<tr>\n<td>16<\/td>\n<td>EZ Steel \/ ASTM A105 \/ B.I Blind Flange SORF ANSI150 \/ 150mm&Oslash;<\/td>\n<td>11.80<\/td>\n<td>30<\/td>\n<td>354<\/td>\n<\/tr>\n<tr>\n<td>17<\/td>\n<td>EZ Steel \/ ASTM A105 \/ B.I Blind Flange SORF ANSI150 \/ 100mm&Oslash;<\/td>\n<td>7.70<\/td>\n<td>20<\/td>\n<td>154<\/td>\n<\/tr>\n<tr>\n<td>18<\/td>\n<td>Black Iron Threadolet<\/td>\n<td>ASTM A193 B7<\/td>\n<td>EZ Steel \/ B.I Threadolet 200mm&Oslash; x 32mm&Oslash; 3000#<\/td>\n<td>0.70<\/td>\n<td>50<\/td>\n<td>35<\/td>\n<\/tr>\n<tr>\n<td>19<\/td>\n<td>EZ Steel \/ B.I Threadolet 150mm&Oslash; x 32mm&Oslash; 3000#<\/td>\n<td>0.70<\/td>\n<td>800<\/td>\n<td>560<\/td>\n<\/tr>\n<tr>\n<td>20<\/td>\n<td>EZ Steel \/ B.I Threadolet 100mm&Oslash; x 50mm&Oslash; 3000#<\/td>\n<td>1.35<\/td>\n<td>50<\/td>\n<td>68<\/td>\n<\/tr>\n<tr>\n<td>21<\/td>\n<td>EZ Steel \/ B.I Threadolet 100mm&Oslash; x 40mm&Oslash; 3000#<\/td>\n<td>0.86<\/td>\n<td>200<\/td>\n<td>172<\/td>\n<\/tr>\n<tr>\n<td>22<\/td>\n<td>Galvanized Iron Welded Elbow 90 Deg.<\/td>\n<td>ASTM A234WPB<\/td>\n<td>ASTM A234 \/ G.I Elbow 90 deg. X 65mm&Oslash; Sch 40<\/td>\n<td>1.31<\/td>\n<td>90<\/td>\n<td>118<\/td>\n<\/tr>\n<tr>\n<td>23<\/td>\n<td>GI Welded Equal Tee<\/td>\n<td>ASTM A234 \/ G.I Equal Tee 65mm&Oslash; Sch 40<\/td>\n<td>1.54<\/td>\n<td>20<\/td>\n<td>31<\/td>\n<\/tr>\n<tr>\n<td>24<\/td>\n<td>Galvanized Iron Threadolet<\/td>\n<td>ASTM A234 \/ G.I Threadolet 20mm&Oslash; Sch 40<\/td>\n<td>0.22<\/td>\n<td>20<\/td>\n<td>4<\/td>\n<\/tr>\n<tr>\n<td>25<\/td>\n<td>Galvanized Iron Welded Coupling Red.<\/td>\n<td>ASTM A234 \/ G.I Coupling Reducer 65mm&Oslash; x 50mm&Oslash; Sch 40<\/td>\n<td>0.64<\/td>\n<td>60<\/td>\n<td>38<\/td>\n<\/tr>\n<tr>\n<td>26<\/td>\n<td>Black Iron Welded End Cap<\/td>\n<td>ASTM A234WPB<\/td>\n<td>EZ Steel \/ ASTM A234 \/ B.I End Cap 150mm&Oslash; Sch 40<\/td>\n<td>2.83<\/td>\n<td>10<\/td>\n<td>28<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: justify;\">Project Background and Our Early Involvement<\/p>\n<p style=\"text-align: justify;\">The Manila Metro Project in the Philippines is a key infrastructure development aimed at improving urban transportation. From the early design stage, we worked closely with the EPC contractor, providing full support across technical consultation, commercial coordination, and quality control.<\/p>\n<p style=\"text-align: justify;\">Our team participated deeply in the planning phase, helping ensure that the pipeline system would meet both safety standards and long-term operational needs.<\/p>\n<p style=\"text-align: justify;\">Technical Support for Material Selection<\/p>\n<p style=\"text-align: justify;\">During the initial stage, our engineering team focused on:<\/p>\n<ul style=\"text-align: justify;\">\n<li>Firefighting pipeline material selection<\/li>\n<li>Pressure rating confirmation<\/li>\n<li>Compliance with project specifications<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">By referencing proven data from metro projects such as Shenzhen Metro, we provided practical and reliable recommendations. This helped the client optimize material choices, especially for ASTM A234 WPB pipe fittings and A105N flanges, which are widely used in high-pressure systems.<\/p>\n<p style=\"text-align: justify;\"><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/3648\/image_other\/2026-04\/pipe-fitting-for-the-manila-metro-project-2.jpg\" alt=\"Pipe Fitting for the Manila Metro Project (2).jpg\" \/><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/3648\/image_other\/2026-04\/pipe-fitting-for-the-manila-metro-project-3.jpg\" alt=\"Pipe Fitting for the Manila Metro Project (3).jpg\" \/><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/3648\/image_other\/2026-04\/pipe-fitting-for-the-manila-metro-project-4.jpg\" alt=\"Pipe Fitting for the Manila Metro Project (4).jpg\" \/><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/3648\/image_other\/2026-04\/pipe-fitting-for-the-manila-metro-project-7.jpg\" alt=\"Pipe Fitting for the Manila Metro Project (7).jpg\" \/>Flexible Commercial Response<\/p>\n<p style=\"text-align: justify;\">Throughout the design process, material requirements were frequently updated. Our sales team responded quickly by:<\/p>\n<ul style=\"text-align: justify;\">\n<li>Providing multiple rounds of detailed quotations<\/li>\n<li>Adjusting product specifications based on design changes<\/li>\n<li>Maintaining clear and efficient communication<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">This flexibility ensured the project stayed on track despite ongoing modifications.<\/p>\n<p style=\"text-align: justify;\">Strict Quality Control and Inspection Support<\/p>\n<p style=\"text-align: justify;\">Quality assurance was a critical part of this project. Our QC team worked closely with the contractor to handle strict third-party inspections, including SGS verification.<\/p>\n<p style=\"text-align: justify;\">Key actions included:<\/p>\n<ul style=\"text-align: justify;\">\n<li>Coordinating inspection schedules<\/li>\n<li>Ensuring all GI pipe fittings met required standards<\/li>\n<li>Supporting documentation and compliance checks<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">This ensured smooth approval and minimized delays during execution.<\/p>\n<p style=\"text-align: justify;\"><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/3648\/image_other\/2026-04\/pipe-fitting-for-the-manila-metro-project-6.jpg\" alt=\"Pipe Fitting for the Manila Metro Project (6).jpg\" \/><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/3648\/image_other\/2026-04\/pipe-fitting-for-the-manila-metro-project-5.jpg\" alt=\"Pipe Fitting for the Manila Metro Project (5).jpg\" \/><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/3648\/image_other\/2026-04\/pipe-fitting-for-the-manila-metro-project-1.jpg\" alt=\"Pipe Fitting for the Manila Metro Project (1).jpg\" \/>Recognition and Project Milestone<\/p>\n<p style=\"text-align: justify;\">After nearly two years of continuous effort, our work was recognized by the project owner. In December 2025, we were officially approved as the only international qualified pipe fitting supplier for the Manila Metro Project, alongside two local suppliers.<\/p>\n<p style=\"text-align: justify;\">This milestone reflects our consistent performance in quality, service, and reliability.<\/p>\n<p style=\"text-align: justify;\">Fast Delivery Before Chinese New Year<\/p>\n<p style=\"text-align: justify;\">In January 2026, with less than 30 days before the Chinese New Year holiday, the client finalized the delivery list and requested urgent shipment.<\/p>\n<p style=\"text-align: justify;\">Thanks to early production planning and internal coordination, we:<\/p>\n<ul style=\"text-align: justify;\">\n<li>Completed manufacturing on schedule<\/li>\n<li>Passed SGS inspection successfully<\/li>\n<li>Delivered goods to Tianjin Port before the holiday<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">This ensured both delivery time and product quality were fully guaranteed.<\/p>\n<p style=\"text-align: justify;\">Our Commitment to Reliable Supply<\/p>\n<p style=\"text-align: justify;\">This project once again proves our core commitment:<\/p>\n<ul style=\"text-align: justify;\">\n<li>Accurate inspection from the beginning<\/li>\n<li>Reliable delivery at every stage<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">If you are looking for a dependable partner, you can explore more about our capabilities and product range on our official website: https:\/\/www.ezindustrialpipe.com\/ including detailed specifications for ASTM A234 WPB pipe fittings, A105N flanges, and GI pipe fittings.<\/p>\n<p style=\"text-align: justify;\">About us<\/p>\n<p style=\"text-align: justify;\">EZ Steel Industrial Co., Ltd is a leading manufacturer of high-performance industrial metal pipelines, specializing in alloy steel, carbon steel, stainless steel, and copper-nickel-based alloy products. With strategically located facilities in Cangzhou, Yangzhou, and Lishui, we deliver globally trusted piping solutions that combine cutting-edge technology, rigorous quality control, and unmatched expertise.<\/p>\n<p><span style='font-size:18px !important;'>Media Contact<\/span><br \/><strong>Company Name:<\/strong> <a href=\"https:\/\/www.abnewswire.com\/companyname\/ezindustrialpipe.com_164232.html\" rel=\"nofollow\">EZ STEEL INDUSTRIAL CO., LTD.<\/a><br \/><strong>Contact Person:<\/strong> Media Relations<br \/><strong>Email:<\/strong> <a href=\"https:\/\/www.abnewswire.com\/email_contact_us.php?pr=ez-steel-becomes-the-only-international-pipe-fitting-supplier-for-the-manila-metro-project\" rel=\"nofollow\">Send Email<\/a><br \/><strong>Phone:<\/strong> +86 188 7402 8402<br \/><strong>Country:<\/strong> China<br \/><strong>Website:<\/strong> <a href=\"https:\/\/www.ezindustrialpipe.com\/\" target=\"_blank\" rel=\"nofollow\">https:\/\/www.ezindustrialpipe.com\/<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.abnewswire.com\/press_stat.php?pr=ez-steel-becomes-the-only-international-pipe-fitting-supplier-for-the-manila-metro-project\" alt=\"\" width=\"1px\" height=\"1px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Changsha,Hunan, China &#8211; September 22, 2026 As a professional pipe fitting supplier, we are proud to support the Manila Metro Project with high-quality products such as ASTM A234 WPB Pipe Fittings, A105N flanges, and GI pipe fittings, ensuring stable and &hellip; <a href=\"https:\/\/www.abnewswire.com\/pressreleases\/ez-steel-becomes-the-only-international-pipe-fitting-supplier-for-the-manila-metro-project_837355.html\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[401,410,403,404,416],"tags":[],"class_list":["post-837355","post","type-post","status-publish","format-standard","hentry","category-Business","category-Manufacturing-Industry","category-UK","category-US","category-World"],"_links":{"self":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts\/837355","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/comments?post=837355"}],"version-history":[{"count":0,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts\/837355\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/media?parent=837355"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/categories?post=837355"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/tags?post=837355"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}