{"id":817278,"date":"2026-06-03T14:14:02","date_gmt":"2026-06-03T14:14:02","guid":{"rendered":"https:\/\/www.abnewswire.com\/pressreleases\/?p=817278"},"modified":"2026-06-03T14:14:02","modified_gmt":"2026-06-03T14:14:02","slug":"successful-installation-and-commissioning-of-vacuum-heating-and-oil-filling-equipment-completed-at-thai-transformer-manufacturer","status":"publish","type":"post","link":"https:\/\/www.abnewswire.com\/pressreleases\/successful-installation-and-commissioning-of-vacuum-heating-and-oil-filling-equipment-completed-at-thai-transformer-manufacturer_817278.html","title":{"rendered":"Successful Installation and Commissioning of Vacuum Heating and Oil Filling Equipment Completed at Thai Transformer Manufacturer"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Rayong, Thailand &#8211;<\/strong> Recently, 2 sets of the <a rel=\"nofollow\" href=\"https:\/\/www.transformer-home.com\/vacuum-drying-and-oil-filling-plant-for-transformer-product\/\">Vacuum Heating and Oil Filling Equipment<\/a> \/ 4290*5700*4370mm supplied by TRIHOPE\u200b was successfully installed, commissioned, and accepted at the production facility of QTC Energy Public Company Limited. Following joint inspection and trial runs by both parties, key performance indicators&mdash;including ultimate vacuum level, leakage rate, temperature control accuracy, and the automatic variable-pressure drying program&mdash;met or exceeded the requirements of the technical agreement. The equipment has now been officially handed over and put into production.<\/p>\n<p style=\"text-align: justify;\"><iframe loading=\"lazy\" title=\"Vacuum Heating and Oil Filling Equipment Installation &amp; Commissioning Project\" src=\"https:\/\/www.youtube.com\/embed\/BZgn8LUHcjE\" frameborder=\"0\" width=\"337\" height=\"599\"><\/iframe><\/p>\n<p style=\"text-align: justify;\">\u258cProject Execution &amp; Technical Highlights<\/p>\n<p style=\"text-align: justify;\">To ensure smooth implementation, TRIHOPE dispatched senior field engineers to Thailand to oversee the entire process, overcoming challenges such as limited workshop space and high ambient humidity:<\/p>\n<p style=\"text-align: justify;\">\u25cf Precision Installation &amp; Piping: Completed leveling of the drying chamber, connection of the vacuum system, hot-air circulation system, and thermal oil heating circuits, with full leak testing.<\/p>\n<p style=\"text-align: justify;\"><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/1076\/image_other\/2026-05\/22.jpg\" alt=\"22.jpg\" \/><\/p>\n<p style=\"text-align: justify;\">\u25cf Intelligent Control Commissioning: Configured and verified the PLC+HMI-based program, enabling precise cyclic pressure variation during the drying process&mdash;effectively preventing core rust and shortening drying cycles.<\/p>\n<p style=\"text-align: justify;\"><img decoding=\"async\" src=\"https:\/\/ecdn6.globalso.com\/upload\/p\/1076\/image_other\/2026-05\/23.jpg\" alt=\"23.jpg\" \/><\/p>\n<p style=\"text-align: justify;\">\u25cf Performance Verification: Achieved an ultimate vacuum leakage rate compliant with JB\/T standards, and stable heating\/cooling curves, fully satisfying the stringent requirements for drying transformer active parts and insulation.<\/p>\n<p style=\"text-align: justify;\">\u258cCustomer Feedback &amp; Training<\/p>\n<p style=\"text-align: justify;\">Throughout commissioning, our engineers provided comprehensive on-site training covering start-up\/shutdown procedures, recipe management, and routine maintenance. The Customer Project Manager commented: <em>&#8220;The professionalism of the <\/em><em>TRIHOPE<\/em><em> technical team gives us great confidence in our continued partnership.&#8221;<\/em><\/p>\n<p style=\"text-align: justify;\">\u258c Conclusion<\/p>\n<p style=\"text-align: justify;\">The successful delivery in Thailand marks another important milestone in TRIHOPE&#8217;s expansion across the Southeast Asian power equipment market. Moving forward, we remain committed to providing world-class vacuum processing equipment and full-lifecycle technical support to customers worldwide.<\/p>\n<p style=\"text-align: justify;\">Source: <a rel=\"nofollow\" href=\"https:\/\/www.transformer-home.com\/\">Transformer-Home<\/a><\/p>\n<p><span style='font-size:18px !important;'>Media Contact<\/span><br \/><strong>Company Name:<\/strong> <a href=\"https:\/\/www.abnewswire.com\/companyname\/transformer-home.com_177907.html\" rel=\"nofollow\">Shanghai Trihope International Co., Ltd.<\/a><br \/><strong>Email:<\/strong> <a href=\"https:\/\/www.abnewswire.com\/email_contact_us.php?pr=successful-installation-and-commissioning-of-vacuum-heating-and-oil-filling-equipment-completed-at-thai-transformer-manufacturer\" rel=\"nofollow\">Send Email<\/a><br \/><strong>Country:<\/strong> China<br \/><strong>Website:<\/strong> <a href=\"https:\/\/www.transformer-home.com\/\" target=\"_blank\" rel=\"nofollow\">https:\/\/www.transformer-home.com\/<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.abnewswire.com\/press_stat.php?pr=successful-installation-and-commissioning-of-vacuum-heating-and-oil-filling-equipment-completed-at-thai-transformer-manufacturer\" alt=\"\" width=\"1px\" height=\"1px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rayong, Thailand &#8211; Recently, 2 sets of the Vacuum Heating and Oil Filling Equipment \/ 4290*5700*4370mm supplied by TRIHOPE\u200b was successfully installed, commissioned, and accepted at the production facility of QTC Energy Public Company Limited. Following joint inspection and trial &hellip; <a href=\"https:\/\/www.abnewswire.com\/pressreleases\/successful-installation-and-commissioning-of-vacuum-heating-and-oil-filling-equipment-completed-at-thai-transformer-manufacturer_817278.html\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[401,410,403,404,416],"tags":[],"class_list":["post-817278","post","type-post","status-publish","format-standard","hentry","category-Business","category-Manufacturing-Industry","category-UK","category-US","category-World"],"_links":{"self":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts\/817278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/comments?post=817278"}],"version-history":[{"count":0,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts\/817278\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/media?parent=817278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/categories?post=817278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/tags?post=817278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}