{"id":551192,"date":"2021-07-05T15:10:01","date_gmt":"2021-07-05T15:10:01","guid":{"rendered":"https:\/\/www.abnewswire.com\/pressreleases\/?p=551192"},"modified":"2021-07-05T15:10:01","modified_gmt":"2021-07-05T15:10:01","slug":"engineered-hardwood-flooring-installation-instructions","status":"publish","type":"post","link":"https:\/\/www.abnewswire.com\/pressreleases\/engineered-hardwood-flooring-installation-instructions_551192.html","title":{"rendered":"Engineered Hardwood Flooring Installation Instructions"},"content":{"rendered":"<p style=\"text-align: justify;\"><span><strong>1. <\/strong><strong>lmportant lnformation before Beginning<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>1.1<\/strong><strong>&nbsp;<\/strong><strong>Installer<\/strong><strong>&nbsp;\/<\/strong><strong>Owner Responsibility<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>Carefully inspect all materials before installation. Materials installed with&nbsp;visible defects are not covered under the warranty. Do not install if you&nbsp;are not satisfied with the flooring; contact your dealer immediately.Final&nbsp;quality checks and approval of the product is the sole responsibility of&nbsp;the owner and installer.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>The installer must determine that the job-site environment and sub-floor&nbsp;surfaces meet applicable construction and material industry standards.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>The Manufacturer declines any responsibility for job failure resulting from&nbsp;deficiencies caused by sub-floor or job-site environment. All sub-floors&nbsp;must be clean, flat, dry and structurally sound.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>1.2<\/strong><strong>&nbsp;<\/strong><strong>Basic Tools and Equipment<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>Broom or vacuum, moisture meter, chalk line &amp; chalk, tapping block,tape measure, safety glasses, hand or electric saw, miter &lsquo;saw,3M blue&nbsp;tape, hardwood floor cleaner, hammer, pry bar, color wood filler,straightedge, trowel.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>2<\/strong><strong>. <\/strong><strong>Job-site conditions<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>2.1 Handling and Storage.<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Don&rsquo;t truck or unload wood flooring in the rain, snow or other humid&nbsp;conditions.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Store wood flooring in an enclosed building that is well ventilated with&nbsp;weather proof windows. Garages and exterior patios, for example, are not appropriate for storing wood flooring<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Leave adequate room for good air circulation around stacks of&nbsp;flooring<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>2.2 Job-site Conditions<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Wood flooring should be one of the last jobs completed in a&nbsp;construction project. Prior to installing hardwood floors. the building&nbsp;must be structurally complete and enclosed, including installation of&nbsp;exterior doors and windows. All finished wall coverings and painting&nbsp;should be completed. Concrete, masonry, drywall, and paint must&nbsp;also be complete, allowing adequate drying time as to not raise&nbsp;moisture content within the building.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf HVAC systems must be fully operational at least 7 days prior to&nbsp;flooring installation, maintaining a consistent room temperature&nbsp;between 60-75 degrees and relative humidity between 35-55%. Engineered hardwood floor may be installed above, on, and below&nbsp;grade level.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf lt is essential that basements and crawl spaces are dry. Crawl&nbsp;spaces must be a minimum of 18&Prime; from the ground to underside of&nbsp;joists. A vapor barrier must be established in crawl spaces using 6mil black polyethylene film with joints overlapped and taped.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf During the final pre-installation inspection, sub-floors must be&nbsp;checked for moisture content using the appropriate metering device&nbsp;for wood and&nbsp;\/or concrete.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Hardwood flooring must acclimate for as long as necessary to meet&nbsp;minimum installation requirements for moisture content.Always use a&nbsp;moisture meter to monitor the flooring and job-site conditions as they&nbsp;acclimate, until the wood is neither gaining nor losing moisture.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>3<\/strong><strong>&nbsp;<\/strong><strong>Sub-floor Preparation<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><strong>3.1 <\/strong><a rel=\"nofollow\" href=\"https:\/\/www.kangton.com\/products-flooring\/\" target=\"_blank\">Wood Sub-floors<\/a><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Sub-floor must be structurally sound and properly secured with nails&nbsp;or screws every 6 inches along joists to reduce the possibility of&nbsp;squeaking.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Wood sub-floors must be dry and free of wax, paint, oil, and debris. Replace any water-damaged or delaminated sub-flooring or&nbsp;underlayments.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Preferred sub-floors &ndash; 3\/4&rdquo; CDX&nbsp;Grade Plywood or 3\/4&rdquo; OSB PS2Rated sub-floorl\/underlayment, sealed side down, with joist spacing of 19.2&Prime; or less; Minimum sub-floors &ndash; 5\/8&rdquo; CDX&nbsp;Grade Plywood sub-floor\/underlayment with joist spacing of no more than 16&Prime;. lf joist&nbsp;spacing is greater than 19.2&Prime; on center, add a second layer of sub-flooring material to bring the overall thickness to 11\/8&Prime; for optimum&nbsp;floor performance.Hardwood flooring should, whenever possible, be&nbsp;installed perpendicular to flooring joists.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Sub-floor moisture check. Measure the moisture content of both&nbsp;the sub-floor and the hardwood flooring with a pin moisture meter.Sub-floors must not exceed 12% moisture content. The moisture&nbsp;difference between sub-floor and hardwood flooring shall not exceed 4%. lf sub-floors exceed this amount, an effort should be made to&nbsp;locate and eliminate the source of moisture before further installation. Do not nail or staple over particle board or similar product.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>3.2 concrete Sub-floors<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Concrete slabs must be of high compressive strength with minimum&nbsp;3,000 psi. In addition, concrete sub-floors must be dry, smooth and&nbsp;free of wax, paint, oil, grease, dirt, non-compatible sealers and&nbsp;drywall compound etc.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Engineered hardwood flooring may be installed on, above, and\/or&nbsp;below-grade.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Lightweight concrete that has a dry density of 100 pounds or less percubic foot is not suitable for engineered wood floors.To check for&nbsp;lightweight concrete, draw a nail cross the top. lf it leaves an&nbsp;indentation, it is probably lightweight concrete.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Concrete sub-floors should always be checked for moisture contentprior to the installation of wood flooring. Standard moisture tests for&nbsp;concrete sub-floors include relative humidity testing, calcium chloride&nbsp;test and calcium carbide test.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Measure the moisture content of the concrete slab using a TRAME&times;concrete moisture meter. If it reads 4.5% or above, then this slab&nbsp;must be checked using calcium chloride tests. Flooring should not&nbsp;be laid if the test result exceeds 3 lbs per 1000 sqft of vapor emissionin a 24-hour period. Please follow the ASTM guideline for concrete&nbsp;moisture testing.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf As an alternative method of concrete moisture testing, In situ relative&nbsp;humidity testing may be used. Reading shall not exceed 75% of&nbsp;relative humidity.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>3.3 Sub-floors other than wood or concrete<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Ceramic, terrazzo, resilient tile and sheet vinyl, and other hard&nbsp;surfaces are suitable as a sub-floor for engineered hardwood flooring&nbsp;installation.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf The above tile and vinyl products should be level and permanently&nbsp;bonded to the sub-loor by appropriate methods. Clean and abrade&nbsp;surfaces to remove any sealers or surface treatments to insure a&nbsp;good adhesive bond. Do not install over more than one layer that&nbsp;exceeds 1\/8&Prime; in thickness over suitable sub-floor.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>4 Installation<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>4.1 Preparation<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf To achieve a uniform color and shade mixture across the entire floor, open and work from several different cartons at a time.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Stagger the ends of boards and maintain at least 6&Prime; between end&nbsp;joints on all adjacent rows.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Undercut door casings 1\/16&Prime; higher than the thickness of the flooring&nbsp;being installed. Also remove existing moldings and wall base.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Start installation parallel to the longest unbroken wall. An out&nbsp;silde wall&nbsp;is often the best.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Expansion space shall be left around the perimeter at least equal to&nbsp;the thickness of the flooring material. For floating installation, the&nbsp;minimum expansion space shall be 1\/2&Prime; regardless of the thickness&nbsp;of the material.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>4.2 Glue-Down Installation Guidelines<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Snap a working line parallel to the staring wall, leaving appropriate&nbsp;expansion space around all vertical obstructions. Secure a straight&nbsp;edge on the working line before spreading adhesive. This prevents&nbsp;movement of the boards that can cause misalignment.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Apply urethane adhesive using a trowel recommended by your glue&nbsp;manufacturer. Do not use a water-based adhesive with this&nbsp;hardwood flooring product.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Spread adhesive from the working line out to approximately the width&nbsp;of two or three boards.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Install a starter board along the edge of the working line and begin&nbsp;installation. Boards should be installed left to right with the tongue&nbsp;side of the board facing the staring wall.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf 3-M Blue Tape should be used to hold planks tightly together and&nbsp;reduce minor shifting of floors during installation. Remove adhesive&nbsp;from the surface of the installed flooring as you work. All adhesive&nbsp;must be removed from flooring surfaces prior to applying 3-M Blue&nbsp;Tape. Remove 3-M Blue Tape within 24 hours.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Thoroughly clean, sweep, and vacuum installed floor and inspect the&nbsp;floor for scratches, gaps and other imperfections. The new floor can&nbsp;be used after 12-24 hours.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>4.3 Nail or Staple Down Installation Guidelines<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf A vapor retarder of asphalt-saturated paper can be installed on the&nbsp;sub-floor before instaling hardwood floor. This will prevent moisture&nbsp;from below and may prevent squeaks.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Snap a working line parallel to the staring wall, allowing expansion&nbsp;space as specified above.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Lay one row of boards along the entire length of the working line, with&nbsp;the tongue facing away from the wall.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Top-nail the first row along the wall edge 1&Prime; &#8211; 3&Prime; from the ends and&nbsp;every 4-6* along the side. Counter sink the nails and fill with&nbsp;appropriate colored wood filler. Use narrow crowned &ldquo;1 &#8211; 1&frac12;&rdquo; <\/span><span>staples\/cleats. Fasteners should hit the joist whenever possible. To&nbsp;ensure proper alignment of flooring, make sure the flooring along the&nbsp;working line is straight.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Blind nail at 45&deg; angle through the tongue 1&Prime; &#8211; 3&Prime; from the end joints&nbsp;and every 4-6&Prime; in between along the length of the starter boards.Denser species may require pre-drilling the holes in the tongue. It&nbsp;might be necessary to blind nail the first few rows.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Continue the installation until finished. Distribute lengths, staggering&nbsp;end joints as recommended above.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Thoroughly clean, sweep, and vacuum installed floor and inspect the&nbsp;floor for scratches, gaps and other imperfections. The new floor can&nbsp;be used after 12-24 hours.<\/span><\/p>\n<p style=\"text-align: justify;\"><span><strong>4.4 Floating Installation Guidelines<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Sub-floor flatness is critical to the success of a floating floor&nbsp;installation. A flatness tolerance of 1\/8&Prime; in a 10-foot radius is required&nbsp;for floating floor installation.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Install leading brand pad &#8211; 2 in 1 or 3 in 1. Follow pad manufacturers&nbsp;instructions. If it is a concrete sub floor, it is required to install a 6 mil&nbsp;polyethylene film.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Snap a working line parallel to the starting wall, allowing expansion&nbsp;space as specified above. <\/span><span>Boards should be installed left to right with the tongue facing away&nbsp;from the wall. Install first three rows by applying a thin bead of glue in&nbsp;the groove on the side and end of each board. Press each board&nbsp;firmly together and lightly use a tapping block if necessary.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Clean excess glue from between boards with a clean cotton cloth. Tape each board together at side and end seams using 3-M Blue&nbsp;Tape. Allow glue to set before continuing installation of subsequent&nbsp;rows.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Continue the installation until finished. Distribute lengths, staggering&nbsp;end joints as recommended above.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u25cf Thoroughly clean, sweep, and vacuum installed floor and inspect the&nbsp;floor for scratches, gaps and other imperfections. The new floor can&nbsp;be used after 12 24 hours.<\/span><\/p>\n<p><span style='font-size:18px !important;'>Media Contact<\/span><br \/><strong>Company Name:<\/strong> <a href=\"https:\/\/www.abnewswire.com\/companyname\/kangton.com_75694.html\" rel=\"nofollow\">Kangton Industry,Inc.<\/a><br \/><strong>Contact Person:<\/strong> Kangton<br \/><strong>Email:<\/strong> <a href=\"https:\/\/www.abnewswire.com\/email_contact_us.php?pr=engineered-hardwood-flooring-installation-instructions\" rel=\"nofollow\">Send Email<\/a><br \/><strong>Phone:<\/strong> 86 021 551511611<br \/><strong>Country:<\/strong> China<br \/><strong>Website:<\/strong> <a href=\"https:\/\/www.kangton.com\/\" target=\"_blank\" rel=\"nofollow\">https:\/\/www.kangton.com\/<\/a><\/p>\n<p><object type=\"text\/html\" data=\"https:\/\/www.kangton.com\/\" style=\"width:900px; height:400px;\"><\/object><img decoding=\"async\" src=\"https:\/\/www.abnewswire.com\/press_stat.php?pr=engineered-hardwood-flooring-installation-instructions\" alt=\"\" width=\"1px\" height=\"1px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1. lmportant lnformation before Beginning 1.1&nbsp;Installer&nbsp;\/Owner Responsibility Carefully inspect all materials before installation. Materials installed with&nbsp;visible defects are not covered under the warranty. Do not install if you&nbsp;are not satisfied with the flooring; contact your dealer immediately.Final&nbsp;quality checks and approval &hellip; <a href=\"https:\/\/www.abnewswire.com\/pressreleases\/engineered-hardwood-flooring-installation-instructions_551192.html\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[418,424,452,410,404],"tags":[],"class_list":["post-551192","post","type-post","status-publish","format-standard","hentry","category-Building-Construction","category-Family-Parenting","category-Living","category-Manufacturing-Industry","category-US"],"_links":{"self":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts\/551192","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/comments?post=551192"}],"version-history":[{"count":0,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/posts\/551192\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/media?parent=551192"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/categories?post=551192"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.abnewswire.com\/pressreleases\/wp-json\/wp\/v2\/tags?post=551192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}